Multech Engineering Consultants
About Us
Services
Projects
Meet the Team
Contact Us
Representative Projects
Hydrologic Analyses
Berryessa Creek Hydrology (Santa Clara Valley Water District)
Coyote Creek Hydrology (Santa Clara Valley Water District)
Las Gallinas Creek Hydrologic Analysis (Marin County, California)
Permanente Creek Hydrology Independent Review (City of Mountain View, California)
Antelope Valley Regional Hydrologic Study (Kern, California)
Duncan Canyon Hydrology (Pinole, California)
Nelson Garden Residential Project (Saratoga, California)
Pine Mountain Club Hydrology (Kern, California)
Arvin Pit Hydrology (Kern, California)
Horned Toad Hill Hydrology (Mojave, California)
Stream Hydraulic and Flood Hazard Studies
Sacramento River Ramos Marina Hydraulic Study
Oak Creek (Kern County, California)
Huntington BeachChannel (Huntington Beach, California)
Lagunitas Bridge and Madera Creek Hydraulic Analysis (Ross, California)
Arcade Creek Flood Study (Sacramento, California)
Pescadero Creek (Pescadero, California)
Chi-Chi Diversion Weir Sediment Management Study (Taiwan)
Matadero Creek (Santa Clara, California)
Rincon and San Jose Creeks (Santa Barbara, California)
Petaluma River (Petaluma, California)
Miners Ravine (Placer County, California)
Twin Oaks Creek (Kern County, California)
Tropico Hill/West Rosamond Alluvial Fan Flood Study
Caliente Creek Near HWY 58 Alluvial Fan Flood LOMR (Kern, California)
Caliente Creek Arvin Area Alluvial Fan Flood LOMR (Kern, California)
Kern River South Levee Upgrade LOMR (Kern, California)
Sediment Transport Studies
Fluvial Sediment Analysis for South San Francisco Bay Shoreline Study Review (U.S. Army Corps, San Francisco District)
Mountain Stream Bedload Transport Study (Colorado)
Guadalupe River and Coyote Creek Sediment Transport (Santa Clara County, California)
Chou-Shui River (Taiwan)
Da-Jia River (Taiwan)
Tseng-Wen River (Taiwan)
San Canyon (Kern County, CA)
Thompson Creek (San Jose, CA)
Watershed Sediment Yield (Taiwan)
Al-Taweelah Power Plant Stable Outfall Channel (Kuwait)
Reservoir Sedimentation Control
Wu-Chieh Reservoir Sediment Flushing (Taiwan)
Tseng-Wen Reservoir Sediment Removal (Taiwan)
Ta-Pu, Ming-De, Bao-Shan, Wu-Sheh, Bai-Ho, Jing-Mein, De-Yuan-Pei, and Yen-Shui-Pei Reservoirs (Taiwan)
Dredged sediment beneficial reuses (Taiwan)
Drainage System Analyses
East Hagginwood Drainage Master Plan (Sacramento, California)
Richmond Parkway Drainage (Richmond, California)
Rosamond Regional Drainage Master Plan (Kern County, California)
Garden Park Drainage (Saratoga, California)
Comfort Inn Site Development Drainage (Morgan Hill, California)
Holiday Inn Express Site Development Drainage (Morgan Hill, California)
Residential Development Drainage Analyses: Tract 5175 (78 acres, 326 lots), Tract 5201 (41 acres, 195 lots), Tract 5240 (24 acres, 80 lots), Tract 5195 (160 acre, 635 lots), Tract 5200 (40 acres, 182 lots), and Tract 5202 (40 acres, 178 lots) (Rosamond, California)
Flood Control System
Guadalupe River Flood Control Risk and
Uncertainty Analysis (Santa Clara County, California)
Jawbone Wash and Cache Creek Channel Improvement (Kern County, California)
Keelung River Basin Flood Reduction Study (Taiwan)
Tice Creek Detention Basin Inlet Structure (Walnut Creek, California)
Lower Mission Creek Channelization (Santa Barbara, California)
Stream Restoration
Tali Creek Stream Restoration (Taiwan)
Willow Creek Restoration (California)
North Canal Restoration (Beijing)
Yongding River Restoration (Beijing)
Miyun Reservoir Tributary Streams
Stormwater Management through Green Infrastructure Measures
Watershed Management
Taipei Water Source Domain Watershed Health Evaluation (Taiwan)
Feitsui Reservoir Watershed BMP Study (Taiwan)
De-Kee, Da-Pu, and Ming-De Reservoir Watersheds (Taiwan)
Management Program Evaluation of Watersheds in Taiwan (Taiwan)
Miyun Reservoir Watershed Management (Beijing)
Physical Hydraulic Modeling
Bollinger Road Bridge Culvert Physical Model Study (California)
East Sunnyvale Channel Bridge Culvert Improvement Model Study (California)